International Solar Project

Diego Garcia

Military

Commercial Customer

Solar

Project Type

Diego Garcia

Location

kW

System Size

Independent Power Systems designed, procured and commissioned two PV grid-tie systems for the American naval and air force base on the remote Indian Ocean atoll Diego Garcia. The first system installed in 2010 has Kyocera PV modules. The second installation in early 2016 has SunPower PV modules. Both types of modules are proven technologies that can handle the challenging tropical environment of the South Pacific.  Key to winning the second bid was IPS’s design which was superior to that requested in the RFP. IPS chose to go with multiple string inverters versus a single central inverter. This had not only the production benefits of superior but also makes future inverter replacement and repairs much easier considering the challenging shipping logistics.

Both systems are performing well and accomplishing the goal of reducing the base’s dependence on diesel fuel while taking advantage of the abundant clean and free fuel, sunshine.

For profound insight into the burden – and national security issue –  that is the military’s dependence on oil, watch The Burden

Building the Future

One System at a Time

Day in and day out we deliver the products and services we would want in our own homes to our clients and customers to help solve their energy challenges. We do this by choosing only the best, safest, and most long-lasting products available to design a system that will continue to perform year after year.